alonso.torres 35b0a893e6 🚧 Save Phase 4 random harness and grid fixes in progress
Save Stage 2 structure, text, geometry and layout generation, independent
oracle checks, frontend seeded replay and plugin visible-value checks.
Include pending grid sync and deletion fixes with focused regressions.

WIP validation: component sync 21 tests / 106 assertions; move shapes
6 tests / 33 assertions. Earlier plugin checks passed 68 full cases,
11 unit tests and types. The final generated replay, golden check,
5000-case gate, full suites and live WASM check remain unfinished.
Stages 3 (swaps/variants) and 4 (library files) have not started.

F124 benchmark ratios against Phase 1e: main 10/100/1000 copies
0.48/0.52/0.54; three levels 0.53; chain 0.56; library 0.52;
many shapes 0.42; variant switch 0.64. No regression flag.
The F125 deletion change still needs its final benchmark.

Save the detailed resume checklist and logs in the local stabilization
plan. Keep that workflow document out of the commit.

AI-assisted-by: GPT-6
2026-10-28 15:53:08 +01:00
..